egte team managed to install the followings for telecom Egypt:

  • 36 x 1500 A DC Power station .
  • 5 x 1000 A DC Power Station .
  • 50 x 60 A DC Power station.
  • 243 x  Battery string BAE 500 AH .
  • 31 x  Battery string BAE 200 AH .
  • 18 x Battery String BAE 800 AH .
  • 6 x Battery string BAE 300 AH .
  • 120 Battery String 120 AH .

 

  •  419 power stations and 222 Battery strings for Eltek at telecom Egypt.
  • 108 Outdoor Power  Station to Etisalat with Fan filter to roll out sites.
  • 234 Outdoor Power  Station for Eltek Egypt at Etisalat with DC Air con to Hybrid sites .
  • 220 VDC & 48 VDC for Attaka Power plant in the national  emergency plane to improve the Egyptian electricity plan .
  •  746 power stations with battery strings
  • 66 Battery cabinets and 70 outdoor Battery Cabinets for Eltek at telecom Egypt.